Burgaw
Burgaw is one of twenty solar assets owned and operated under the name North Carolina Solar. A ground mount system over a 33.3 acre (135,000 square meter) area in Pender County, North Carolina; the Burgaw site has the capacity to generate 6.7 megawatts of renewable energy.
With 56,160 two by one meter solar panels installed, Burgaw came on stream in November 2019 and is fully contracted to the Duke Energy Progress.
The site uses First Solar 4120A modules, Fronius Symo 24.0 inverters and a RBI Solar fixed-title mounting system.