Our operations
Battle River
Battle River
The Battle River 4 and 5 facilities are located near Forestburg, Alberta.
Battle River 4 achieved commercial operations in 1975, while Battle River 5 achieved commercial operations in 1981.
Battle River 4 and 5 have a capacity of 155 megawatts (MW) and 395 MW, respectively, having completed their conversion to natural gas in 2021 and 2019, respectively. The end of regulatory life for Battle River 4 and 5 is set for 2033 and 2037, respectively.
Generation from the facilities is currently sold in the Alberta electricity market.
On Nov. 2, 2026, TransAlta provided notice to the Alberta Electric System Operator (AESO) that Battle River Units 4 and 5 will be mothballed effective March 1, 2027, for a period of time up to Jan. 1, 2029. Battle River Units 4 and 5 will remain available and fully operational through to March 1, 2027.
Battle River
Forestburg, AB
Gas
Fuel type
550 MW
Gross Installed Capacity
100%
TransAlta ownership